Project: Port Of Alexandria Substation 66/ 11 KV GIS
Project Owner: General Authority for Alexandria Port
Project Consultant: Egyptian Electricity Transmission Company (EETC)
Equipment : Single girder EOT, capacity = 5 Ton, Lifting height = 5.5 m, span = 10.1 m, Runway length = 23.6 m
Projects
Port Of Alexandria Substation 66/ 11 KV GIS
EL Basateen (3) 66/11 KV GIS Substation
Project Owner: Egyptian Electricity Transmission Company (EETC)
Project Consultant: Egyptian Electricity Transmission Company (EETC)
Equipment List:
- Monorail, chain hoist, capacity = 3 Ton, Lifting height =5 m, Runway
length = 5 m
Alexandria Port – Multi-Purpose Terminal (Berth 55-62)
Project Owner: Egyptian Group for Multi-purpose Stations (EGMPT)
Project Consultant: Dar Al-Handasah Consultancy (dar)
Equipment List:
- Monorail, chain hoist, capacity = 5 Ton, Lifting height =5 m, Runway length = 14 m (curved beam).
- Manual chain hoist, capacity = 3.2 Ton, Lifting height = 3.2 m, Runway length = 8.5 m, Qt. (2)
Monorail Zayed 66/22 KV GIS Substation
Project Owner: Egyptian Electricity Transmission Company (EETC)
Project Consultant: Egyptian Electricity Transmission Company (EETC)
Equipment List:
- Single girder EOT, capacity = 5 Ton, Lifting height = 6 m, span = 10.05 m, Runway length = 23.5 m
Egypt International City For Olympic Games in the Administrative Capital – Chiller Building
Project Owner: Engineering Authority of the Egyptian Armed Forces
Project Consultants:
- SHAKER Consultancy Group
- Hydro-Envir.&Infra Str.Studies
Equipment List:
- Single girder EOT, capacity = 3 Ton, Lifting height = 6 m, span = 16.185 m, Runway length = 28.8 m
Elsadat Industrial Park
Project Owner: El Sewedy for Development and Management
Project Consultant: Engineering Consultant Group (ECG)
Equipment List:
- Single girder, capacity = 5 Ton, single girder, Lifting height = 5.5 m, span = 9.4 m, Runway length = 31 m.
- Single girder, capacity = 0.5 Ton, Lifting height = 5 m, span = 5.4 m, Runway length = 7.5 m.
- JIB crane, capacity = 5 Ton, Lifting height = 10.7 m, Arm = 7.2 m, Manual rotation 180°.
- JIB crane capacity = 0.5 Ton, Lifting height = 10.7 m, Arm = 7.2 m, Manual rotation 180
Port Said West Industrial 220KV GIS Substation
Project Owner: Egyptian Electricity Transmission Company (EETC)
Project Consultant: Egyptian Electricity Transmission Company (EETC)
Equipment List:
- Single girder EOT, capacity = 10 Ton, Lifting height = 6.6 m, span = 13.5 m, Runway length = 47.45 m
Monorail, capacity 3 Ton, lifting height = 6 m, runway length 6 m
Toshka 4 – 220/66/22 KV GIS Substation
Project Owner: Egyptian Electricity Transmission Company (EETC)
Project Consultant: Power Generation Engineering & Service Co. (PGESCO)
Equipment List:
- Single girder, capacity = 9 Ton, Lifting height = 6.8 m, span = 14.65 m, Runway length = 47.25 m.
- Single girder, capacity = 6 Ton, Lifting height = 6 m, span = 11.65 m, Runway length = 27.34 m.
- Monorail, Capacity = 3 Ton, Lifting height = 6 m, Runway length = 6 m
Mahmoudia 330 MW simple cycle power plant
We supplied & installed to “Mahmoudia 330 MW simple cycle power plant” the following:
- Double girder EOT, capacity = 5 Ton, lifting height = 10m, span = 4.40 m, travel = 15 m.
- Double girder EOT, capacity = 5 Ton, lifting height = 13m, span = 5.25 m, travel = 7 m.
Cairo West Supercritical Power Station 1×650 MW CP-118 Miscellaneous Hoists
We supplied to “Cairo West Supercritical Power Station 1×650 MW CP-118 Miscellaneous Hoists” the following:
- Monorail hoist, capacity = 20 Ton, Lifting height = 8.0 m, = 3 units
- Monorail hoist, capacity = 5 Ton, Lifting height = 35 m
- Monorail hoist, capacity = 5 Ton, Lifting height = 8.0 m, Qt. = 2 units
- Monorail hoist, capacity = 5 Ton, Lifting height = 5.0 m, Qt. = 2 units
- Monorail hoist, capacity = 3 Ton, Lifting height = 8.0 m
- Monorail hoist, capacity = 2 Ton, Lifting height = 5.6 m
Assiut Supercritical Power Plant 1 X 650 MW Steam Power Station CP-18 Miscellaneous Cranes & Hoists
We supplied & installed to “Assiut Supercritical Power Plant 1 X 650 MW Steam Power Station CP-18 Miscellaneous Cranes & Hoists” the following:
- Monorail hoist, capacity = 14.5 Ton, Lifting height = 5.21 m
- Monorail hoist, capacity = 8 Ton, Lifting height = 2.7 m, Qt. = 2 units
- Monorail hoist, capacity = 6 Ton, Lifting height = 5.34 m
- Monorail hoist, capacity = 5 Ton, Lifting height = 5.4 m
- Monorail hoist, capacity = 5 Ton, Lifting height = 5.4 m
- Monorail hoist, capacity = 4 Ton, Lifting height = 4.8 m
- Monorail hoist, capacity = 3.5 Ton, Lifting height = 4.8 m
- Monorail hoist, capacity = 3.5 Ton, Lifting height = 4.7 m
- Monorail hoist, capacity = 2 Ton, Lifting height = 4.0 m, Qt. = 2 units
- Monorail hoist, capacity = 2 Ton, Lifting height = 4.8 m
- Monorail hoist, capacity = 1 Ton, Lifting height = 3.0 m
Al-Lahoon – 220/22/22 KV GIS S/S
Project Owner: National Company for Protective Cultivators (NCPC)
Executed by: Egyptian Military Works Department
Project Consultant: Egypt Electricity Transmission Company (EETC)
Equipment List:
- Single girder EOT, capacity = 10 Ton, lifting height = 6.5 m, span = 12.08 m, travel = 30.65 m.
- Monorail, capacity 3 Ton, lifting height = 6 m
Extension of Toshka (2) – 500 KV GIS S/S:
Project Owner: Egypt Electricity Transmission Company (EETC)
Project Consultant: Power Generation Engineering & Service Co. (PGESCO)
Equipment List:
- Single girder EOT, capacity = 7 Ton, lifting height = 10.7 m, span = 16.4 m, travel = 84.78 m.
- Monorail, capacity 3 Ton, lifting height = 6 m
Canal Sugar Factory – 220/33/33 kV GIS S/S:
Project Owner: Canal Sugar Company
Project Consultant: Electric Power Systems Engineering Co. (EPS)
Equipment List:
- Single girder EOT, capacity = 7 Ton, lifting height = 6.5 m, span = 11.8 m, travel = 35.75 m.
- Monorail, capacity 3 Ton, lifting height = 5.3 m
Port Said East Industrial Zone – 220/66/22 kV GIS S/S:
Project Owner: Egyptian Military Works Department
Project Consultant: Egypt Electricity Transmission Company (EETC)
Equipment List:
-
- Single girder EOT, capacity = 7 Ton, lifting height = 6.5 m, span = 11.8 m, travel = 35.75 m.
- Monorail, capacity 3 Ton, lifting height = 5.3 m
The Pharaonic Petroleum Company (PhPC) – Port Said project
Project Owner: Egyptian Petroleum Services Co. (EPSCO)
Project Consultant: Egyptian Petroleum Services Co. (EPSCO)
Equipment List:
- Single girder EOT Kit, capacity = 3.2 Ton, lifting height = 5.75 m
Badr City Substation 220KV:
Project Owner: National Service Projects Orgnization (NSPO)
Project Consultants:
- Egypt Electricity Transmission Company (EETC)
- Electric Power Systems Engineering Co. (EPS)
Equipment List:
- Single girder EOT, capacity = 5 Ton, lifting height = 6.8 m, span = 11.9 m, travel = 41 m.
- Monorail, capacity = 1.6 ton, lifting height = 5 m
Cairo Capital S/S1 500/220/66/22kV GIS Substation:
Project Owner: Administrative Capital for Urban Development (ACUDP)
Executed by: Egyptian Military Works Department
Project Consultant: Egypt Electricity Transmission Company (EETC)
Equipment List:
- Single girder EOT, capacity = 8 Ton, lifting height = 9.7 m, span = 14.15 m, travel = 97.75 m.
- Single girder EOT, capacity = 6.3 Ton, lifting height = 6.2 m, span = 14.15 m, travel = 71.75 m.
- Single girder EOT, capacity = 5 Ton, lifting height = 5.3 m, span = 10.05 m, travel = 32.75.
- Monorail, capacity 1.6 Ton, lifting height = 10 m
- Monorail, capacity = 1.6 ton, lifting height = 5 m
Assiut Supercritical Power Plant 1 X 650 MW Steam Power Station CP-18 Miscellaneous Cranes & Hoists:
Project Owner: Upper Egypt Electricity Production Company (UEEPC)
Project Consultant: Power Generation Engineering & Service Co. (PGESCO)
Equipment List:
- Monorail hoist, capacity = 14.5 Ton, Lifting height = 5.21 m
- Monorail hoist, capacity = 8 Ton, Lifting height = 2.7 m, Qt. = 2 units
- Monorail hoist, capacity = 6 Ton, Lifting height = 5.34 m
- Monorail hoist, capacity = 5 Ton, Lifting height = 5.4 m
- Monorail hoist, capacity = 5 Ton, Lifting height = 5.4 m
- Monorail hoist, capacity = 4 Ton, Lifting height = 4.8 m
- Monorail hoist, capacity = 3.5 Ton, Lifting height = 4.8 m
- Monorail hoist, capacity = 3.5 Ton, Lifting height = 4.7 m
- Monorail hoist, capacity = 2 Ton, Lifting height = 4.0 m, Qt. = 2 units
- Monorail hoist, capacity = 2 Ton, Lifting height = 4.8 m
- Monorail hoist, capacity = 1 Ton, Lifting height = 3.0 m
Cairo West Supercritical Power Station 1×650 MW CP-118 Miscellaneous Hoists:
Project Owner: Cairo Electricity Production Company (CEPC)
Project Consultant: Power Generation Engineering & Service Co. (PGESCO)
Equipment List:
- Monorail hoist, capacity = 20 Ton, Lifting height = 8 m, Qt. = 3 units
- Monorail hoist, capacity = 5 Ton, Lifting height = 35 m
- Monorail hoist, capacity = 5 Ton, Lifting height = 8 m, Qt. = 2 units
- Monorail hoist, capacity = 5 Ton, Lifting height = 5 m, Qt. = 2 units
- Monorail hoist, capacity = 3 Ton, Lifting height = 8.0 m
- Monorail hoist, capacity = 2 Ton, Lifting height = 5.6 m
Mahmoudia 330 MW simple cycle power plant:
Project Owner: Middle Delta Electricity Production Company (MDEPC)
Project Consultant: Engineering Consultant Group (ECG)
Equipment List:
- Double girder EOT, capacity = 5 Ton, lifting height = 10m, span = 4.40 m, travel = 15 m.
- Double girder EOT, capacity = 5 Ton, lifting height = 13m, span = 5.25 m, travel = 7 m.